All tools › Mini-Bundles › The Pre/Post-Mortem Pair
Mini-Bundle

The Pre/Post-Mortem Pair

Predict and audit. The pre-mortem imagines the failure before kickoff while changing course is still cheap. The post-mortem checks the prediction at closeout, blamelessly, and turns it into decisions.

$49 one-time, instant download
✓ 2 Excel worksheets · ✓ $78 à la carte, save $29 · ✓ Facilitation guides
Buy Now, $49
Secure checkout via Gumroad · 30-day refund
Or get all 17 PM tools for $99 ($533 value). The full toolkit ships every template in the catalog: status reports, RAID logs, charters, OKRs, and more. See what's in the bundle ›

What's in the download

Pre-Mortem Tool ($39 standalone)

60-minute kickoff session: failure imagination, root-cause clustering, severity scoring, mitigation ownership. The framing gets the team past polite kickoff energy.

Post-Mortem Tool ($39 standalone)

90-minute blameless closeout: what happened, what worked, what didn't, what changes. Built to produce decisions, not narratives.

Why the two sessions are one discipline

Most teams run neither session. Kickoff is optimism theater, closeout is a rush to the next thing, and the same failure modes repeat program after program because nobody wrote them down at either end.

Run as a pair, the two sessions close the loop. The pre-mortem names the ways this program dies while the team can still do something about it. The post-mortem checks the list: which predicted failures happened, which mitigations held, and what nobody saw coming. The second program you run this loop on starts smarter than the first.

"The pre-mortem is a prediction. The post-mortem is the audit of that prediction."

Both worksheets ship with step-by-step facilitation guides, including the scripts for the awkward moments: the sponsor who treats imagined failures as disloyalty, and the retro that starts hunting for a person instead of a cause.

Questions PMs ask

Do I need both, or is one enough?

You can run either alone; each stands on its own. But the loop is the point: the pre-mortem produces the predictions, the post-mortem audits them. Teams that run both stop repeating their failures by the second program.

How long do the sessions take?

The pre-mortem is a 60-minute kickoff session. The post-mortem is a 90-minute closeout. Both guides include the minute-by-minute agenda.

How is this different from the $99 full bundle?

The full bundle is all 17 tools. The pair is $49 for the two facilitation worksheets. If you want the RAID log and risk register that carry the pre-mortem's outputs through the program, the $99 bundle includes all of it.

Free download

Not ready to buy? Start with the free cheat sheet.

One page, no cost. The exact status format I use to brief leadership in under five minutes. It is the fastest way to see how these tools read before you spend anything.

Get the cheat sheet, free ›